New building at Bausch + Ströbel

pice_pt122009.jpg

At Bausch + Ströbel, manufacturer of special machines, the extension to the assembly building was opened last Spring and now at the end of September the topping-out ceremony for the additional floors on the engineering building took place. The three new floors on the engineering building add 1590 square meters of office floor space. A total of 3.5 million Euros have been invested in these two building projects. But these are not the only investments since the company restructuring in 2007. For manufacturing and office equipment a further 2.9 million Euros have been assigned as well as two million for technical equipment and machinery. Furthermore two hectares of land around the existing company property were bought for optional further extensions.

back to overview